Quiz on Mission Chandrayaan-3 by ISRO | MCQs
Test your knowledge about India’s remarkable lunar mission, Chandrayaan-3, with an engaging quiz.
Challenge yourself with multiple-choice questions on its objectives, scientific instruments, launch details, and more. Explore the mission’s significance, advancements, and latest updates through this fun and informative Chandrayaan-3 quiz. How well do you know about India’s lunar aspirations?
Take the quiz and find out!
- Question of
Chandrayaan-3 is the ______lunar misison of ISRO.
- First
- Second
- Third
- Fourth
Correct Wrong
- Question of
The main objective of Chandrayaan-3 is to:
- Establish a human colony on the Moon
- Conduct a comprehensive study of Mars’ atmosphere
- Study the surface and mineralogy of the Moon
- Search for signs of extraterrestrial life on the Moon
Correct Wrong
- Question of
Chandrayaan-3 is a follow-up mission to which previous Indian lunar mission?
- Chandrayaan-1
- Chandrayaan-2
- Mangalyaan
- Astrosat
Correct Wrong
- Question of
The Chandrayaan-3 mission includes an orbiter, a lander, and a rover, similar to its predecessor Chandrayaan-2.
- True
- False
Correct Wrong
- Question of
When was the Chandrayaan-3 mission originally planned to launch?
- 2020
- 2021
- 2022
- 2023
Correct Wrong
- Question of
The rover of Chandrayaan-3 is named as
- Pragyan
- Vikram
- Mangalyaan
- Aditya
Correct Wrong
- Question of
What was the reason behind the failure of the Vikram lander during Chandrayaan-2?
- Collision with an asteroid
- Technical glitch during descent
- Communication failure with the orbiter
- Lunar dust storms
Correct Wrong
- Question of
Which launch vehicle is expected to carry Chandrayaan-3 to the Moon?
- GSLV Mk III
- PSLV
- Ariane 5
- Falcon Heavy
Correct Wrong
- Question of
Chandrayaan-3 is a collaborative mission with:
- NASA
- ESA (European Space Agency)
- JAXA (Japan Aerospace Exploration Agency)
- Roscosmos (Russian Space Agency)
Correct Wrong
- Question of
What crucial component was lost during the Chandrayaan-2 mission but has been redesigned and upgraded for Chandrayaan-3?
- Rover’s solar panels
- Lander’s landing legs
- Orbiter’s communication antenna
- Rover’s drill for sample collection
Correct Wrong
- Question of
What is the name of the rover of Chandrayaan 3 ?
- Vikram
- Bheem
- Pragyaan
- Dhruv
Correct Wrong
- Question of
The mission life of the Lander and Rover of Chandrayaan 3 is equal to
- 10 Earth Days
- 14 Earth Days
- 20 Earth Days
- 18 Earth Days
Correct Wrong
- Question of
Total cost of Chandrayaan 3 mission is arounf
- 1200 Crores INR
- 712 Crores INR
- 600 Crores INR
- 960 Crores INR
Correct Wrong
- Question of
Total weight of Chandrayaan 3 is
- 4,100 kilograms
- 3,900 kilograms
- 2,190 kilograms
- 5,200 kilograms
Correct Wrong
- Question of
Who is the director of the Chandrayaan 3 mission?
- S Mohana Kumar
- K Sivan
- Ritu Karidhal
- S Somnath
Correct Wrong
- Question of
Chandrayaan 3 landed near ____________ of the moon?
- the South Pole
- the North Pole
- the equatorial region
- None of the Above
Correct Wrong
- Question of
Which country is the fourth country to successfully land a spacecraft on the moon?
- USA
- China
- Russia
- India
Correct Wrong
- Question of
Which country is the first country to successfully land a spacecraft on the south pole of moon?
- Russia
- USA
- China
- India
Correct Wrong
- Question of
What are the scientific instruments that will be carried by the lander and rover in Chandrayaan 3?
- Surface science instruments
- Atmospheric science instruments
- Water science instruments
- All of the above
Correct Wrong
- Question of
Who is the Rocket Woman Behind Chandrayaan 3 Mission?
- Tessy Thomas
- Moumita Datta
- Ritu Karidhal
- Nandini Harinath
Correct Wrong
- Question of
On August 23, 2023, lander of Chandrayaan 3 landed on moon. August 23 will be celebrated as
- National Space Day
- Chandrayaan 3 Day
- ISRO Day
- National Lander Day
Correct Wrong
- Question of
What name is given to the Chandrayaan 3 landing spot?
- Shiva-Shakti Point
- Shiva-Parvati Point
- Shiva-Shambhu Point
- Shiva-Bhakti Point
Correct Wrong
- Question of
ChaSTE Payload sent the message about
- Air pressure on the moon
- Temperature Profile of Top Soil
- Ice and Water level on the moon
- None of the above
Correct Wrong
- Question of
Who is the project director of India’s Moon Mission, Chandrayaan 3?
- Vikram Sarabhai
- S. Somnath
- Ritu Karidhal Srivastava
- P Veeramuthuvel
Correct Wrong
- Question of
How many days did Chandrayaan 3 took to reach the moon’s surface?
- 39 days
- 40 days
- 41 days
- 42 days
Correct Wrong
- Question of
Where is the ISRO Telemetry, Tracking and Command Network (ISTRAC) located?
- New Delhi
- Mumbai
- Chennai
- Bengaluru
Correct Wrong